Specification
Specification for Hydraulically Bound Mixtures for use in construction projectsWhat follows describes the framework for a specification that has been developed for the production, construction and testing of HBM. The full specification is similar to the 800 series of the Specification for Highway Works (SHW). Unlike the SHW however, it is applicable to the use of HBM for trench reinstatements and non-road applications such as coastal protection as well as for pavements. The full specification can be made available on request.
XX0 General Requirements
Hydraulically bound mixtures shall be produced, constructed and tested in accordance with the following Clauses. The permitted HBM for the Works shall be shall be selected from BSEN 14227-1, -2, -3, -5, -10, -11, -12, -13 & -14.
XX1 Constituents
XX2 Storage of constituents
XX3 General Requirements for Production and Construction
XX4 Mix-in-Plant Method of Construction Using Batching by Mass
XX5 Mix-in-Plant Method of Construction Using Volume Batching
XX6 Mix-in-Place Method of Construction
XX7 Method Statement and Demonstration Area for All Methods of Construction
XX8 HBM to BSEN 14227-1, 2, 3 & 5
XX9 HBM to BSEN 14227-10, -12, -13 & -14
XX10 Testing, Control and Checks for HBM
XX11 Laboratory Mixture Design procedure for HBM