Kingsley to Froghall reconstruction, Staffordshire
Location: A52 Kingsley to Froghall reconstruction
Date: 1997
Client: Staffordshire County Council
Technical Data: 100mm bituminous material on
300mm FABM 1 (3% lime + 12% fly ash + 85% granular material reclaimed
from existing pavement)
Innovation: 1st UK use of FABM 1 (granular material treated by
fly ash & lime). FABM 1 was used for sub-base and base. Aggregate
for FABM 1 was recycled from existing pavement
JK Role: Pavement designer and construction advisor for client
|