Hydraulically Bound Mixtures
Information Portal On Hydraulically Bound Mixtures
Gallery 9 - A52 Kingsley To Froghall Reconstruction, Staffordshire

Gallery 9

A52 Kingsley To Froghall Reconstruction, Staffordshire
Location: A52 Kingsley to Froghall reconstruction
Date: 1997
Client: Staffordshire County Council
Technical Data: 100mm bituminous material on
300mm FABM 1 (3% lime + 12% fly ash + 85% granular material reclaimed from existing pavement)
Innovation: 1st UK use of FABM 1 (granular material treated by fly ash & lime). FABM 1 was used for sub-base and base. Aggregate for FABM 1 was recycled from existing pavement
JK Role: Pavement designer and construction advisor for client

A52 Kingsley to Froghall reconstruction, Staffordshire
A52 Kingsley to Froghall reconstruction, Staffordshire
A52 Kingsley to Froghall reconstruction, Staffordshire
A52 Kingsley to Froghall reconstruction, Staffordshire
A52 Kingsley to Froghall reconstruction, Staffordshire
A52 Kingsley to Froghall reconstruction, Staffordshire

Information Portal On Hydraulically Bound Materials