Hydraulically Bound Mixtures
Information Portal On Hydraulically Bound Mixtures  
Hydraulically Bound Mixtures
Chemical & Physical
European Standards
Test Methods
Coastal & Water Related Structures
Pavements
Piles & Columns
Recycling
Fly Ash Bound Mixtures
Flushing SBM
Remediation
Strengthened Fill
Heavy Foundations
Case Studies
Sustainability
Specification
Trench Reinstatement

GALLERY 12

A28 autoroute, Normandy, France
Location: A28 Autoroute Haute-Normandie, France
Date: 1997
Technical Data: traffic 80msa
225mm bituminous material on
225mm FABM 2 (1.5%lime + 8.5% fly ash + 90%agg) on
350mm stabilized capping on earthworks (upper 1m lime improved)

A28 Autoroute Haute-Normandie, France
A28 Autoroute Haute-Normandie, France
A28 Autoroute Haute-Normandie, France
A28 Autoroute Haute-Normandie, France
 
Gallery
Newsletter
 

Hydraulically Bound Mixtures For Pavements

 
Information Portal On Hydraulically Bound Materials